2007 Team Members

  • James Barefield, 2007
  • Jay Carnes, 2009
  • John Courtright, 2009
  • Beverly Faulkner, 2007--President
  • Ben Gibson, 2007--Past President
  • Mary Keller, 2008
  • Sue Kinkead, 2008--Secretary
  • Don Siebe, 2008

2007 Projects Completed

  • Fellowship hall exterior door replaced
  • Parsonage review and inventory (February) – required by DS
  • Water, tiles, and insulation removed from closet and library
  • Snow shoveled from flat roof
  • Jalousie windows in the chapel and choir loft replaced
  • Threshold into Narthex from Entry replaced
  • Sidewalk snow removal contract completed
  • Snow blower for church operational
  • Church flat roof inspection by Garland Company performed
  • Handyman initial work orders written
  • Repaired door closing mechanism for south sanctuary exit
  • Sanctuary roof south wing membrane repaired
  • Gutter on north side of Fellowship Hall repaired
  • Bathroom doors in Fellowship Hall re-hung
  • Water damaged arch at east end of sanctuary refinished
  • Lawn care at church and parsonage initiated
  • Leaking sink repaired in women’s restroom between Sanctuary and Friendship Center
  • Weeds cut along north edge of church property
  • Weeds in parking lot and sidewalk treated
  • Ceiling tiles and insulation replaced in Library
  • Ceiling tile and insulation replaced in Asbury Room
  • Drywell for front sprinkler system excavated
  • Replaced locks on coffee cabinets in Fellowship Hall
  • Faucet repaired in library
  • Exit sign light bulbs replaced
  • Low energy bulb replacement initiated
  • Light fixtures in music room repaired
  • Pew support repaired
  • Storage shed ramp purchased and installed
  • Kitchen disposal unclogged
  • Gutters hung on Fellowship Hall
  • Downspouts redirected
  • French Drain flooding potential mitigated
  • New cut-off valve installed in back sprinkler system
  • Swamp coolers operational
  • Leak under Asbury window sill identified
  • Missing fire hoses (3) discovered
  • Need to replace water fire extinguishers identified
  • Down spout flow directed away from Asbury Room
  • Carpet installer identified
  • Exterior/interior re-lamping underway w/ low watt bulbs
  • Trees removed from parking lot north edge
  • Overhead lights replaced in music room
  • Northeast arch water damage restored
  • Front lawn sprinkler system rehabilitated
  • Gutters installed around Fellowship Hall roof
  • Disposal unclogged in kitchen
  • Drain problem in men’s room off sanctuary discovered
  • Urinal water pipe repaired in restroom
  • Carpet for sanctuary measured and ordered
  • Drain in men’s room removed by jackhammer
  • Brush removed from south side of church
  • Pad for outreach emergency trailer constructioned
  • Drain in men’s room cut out and replaced
  • Men’s room floor rebuilt and retiled
  • Men’s room repainted and fixtures replaced
  • Sanctuary and prayer room emptied
  • Music room emptied and repainted
  • Choir loft emptied and cleaned
  • Sanctuary pews moved and chancel area cleared
  • New carpet installed in sanctuary
  • Pews restored and worship materials returned to sanctuary
  • Four water fire extinguishers replaced by A/B/C models
  • Ceiling tile in secretary’s office refurbished
  • Office shredder replaced
  • Refurbish/resurface parking lot
  • Facility use policy revised (Oct.-Nov.)
  • Parsonage washer/dryer/refrigerator replaced
  • Parsonage backyard fence built
  • 15 parsonage windows replaced
  • Metal folding chairs in Fellowship Hall replaced
  • Fellowship Hall tables replaced
  • Replace furnace filters (29 filters, in hand)
  • Negotiate snow removal contracts
  • Close swamp coolers: blow lines and cover
  • Shut down sprinkler system
  • Latch in women's restroom repaired
  • Downspouts added to gutter on north side of Fellowship Hall
  • Parking lot lights replaced
  • Chancel kneeling boxes painted
  • Friendship Center contents removed temporarily
  • Friendship Center recarpeted
  • Friendship Center contents restored
  • New bulletin board installed
  • New FUMC sign installed at entry
  • New computers purchased

Continuing issues:

  • Education wing furnace repair (continuing problem); Carol Mead resource
  • Flat roof leaks
  • Mission statement
  • Fellowship Hall roof leak in skate closet

    On-going Projects:

  • Fellowship hall roof  restoration
  • Re-seal windows on north side of church entry
  • Modify French drain at south sanctuary exit to conform to Fire Dept. directive
  • Restore outside to the old furnace room
  • Refurbish exterior windows in Friendship Center
  • Replace driveway, north side of Education wing
  • Install new FUMC sign in front of church
  • Remove poplar trees along south side of front lawn