2007 Team Members
- James Barefield, 2007
- Jay Carnes, 2009
- John Courtright, 2009
- Beverly Faulkner, 2007--President
- Ben Gibson, 2007--Past President
- Mary Keller, 2008
- Sue Kinkead, 2008--Secretary
- Don Siebe, 2008
2007 Projects Completed
- Fellowship hall exterior door replaced
- Parsonage review and inventory (February) – required by DS
- Water, tiles, and insulation removed from closet and library
- Snow shoveled from flat roof
- Jalousie windows in the chapel and choir loft replaced
- Threshold into Narthex from Entry replaced
- Sidewalk snow removal contract completed
- Snow blower for church operational
- Church flat roof inspection by Garland Company performed
- Handyman initial work orders written
- Repaired door closing mechanism for south sanctuary exit
- Sanctuary roof south wing membrane repaired
- Gutter on north side of Fellowship Hall repaired
- Bathroom doors in Fellowship Hall re-hung
- Water damaged arch at east end of sanctuary refinished
- Lawn care at church and parsonage initiated
- Leaking sink repaired in women’s restroom between Sanctuary and Friendship Center
- Weeds cut along north edge of church property
- Weeds in parking lot and sidewalk treated
- Ceiling tiles and insulation replaced in Library
- Ceiling tile and insulation replaced in Asbury Room
- Drywell for front sprinkler system excavated
- Replaced locks on coffee cabinets in Fellowship Hall
- Faucet repaired in library
- Exit sign light bulbs replaced
- Low energy bulb replacement initiated
- Light fixtures in music room repaired
- Pew support repaired
- Storage shed ramp purchased and installed
- Kitchen disposal unclogged
- Gutters hung on Fellowship Hall
- Downspouts redirected
- French Drain flooding potential mitigated
- New cut-off valve installed in back sprinkler system
- Swamp coolers operational
- Leak under Asbury window sill identified
- Missing fire hoses (3) discovered
- Need to replace water fire extinguishers identified
- Down spout flow directed away from Asbury Room
- Carpet installer identified
- Exterior/interior re-lamping underway w/ low watt bulbs
- Trees removed from parking lot north edge
- Overhead lights replaced in music room
- Northeast arch water damage restored
- Front lawn sprinkler system rehabilitated
- Gutters installed around Fellowship Hall roof
- Disposal unclogged in kitchen
- Drain problem in men’s room off sanctuary discovered
- Urinal water pipe repaired in restroom
- Carpet for sanctuary measured and ordered
- Drain in men’s room removed by jackhammer
- Brush removed from south side of church
- Pad for outreach emergency trailer constructioned
- Drain in men’s room cut out and replaced
- Men’s room floor rebuilt and retiled
- Men’s room repainted and fixtures replaced
- Sanctuary and prayer room emptied
- Music room emptied and repainted
- Choir loft emptied and cleaned
- Sanctuary pews moved and chancel area cleared
- New carpet installed in sanctuary
- Pews restored and worship materials returned to sanctuary
- Four water fire extinguishers replaced by A/B/C models
- Ceiling tile in secretary’s office refurbished
- Office shredder replaced
- Refurbish/resurface parking lot
- Facility use policy revised (Oct.-Nov.)
- Parsonage washer/dryer/refrigerator replaced
- Parsonage backyard fence built
- 15 parsonage windows replaced
- Metal folding chairs in Fellowship Hall replaced
- Fellowship Hall tables replaced
- Replace furnace filters (29 filters, in hand)
- Negotiate snow removal contracts
- Close swamp coolers: blow lines and cover
- Shut down sprinkler system
- Latch in women's restroom repaired
- Downspouts added to gutter on north side of Fellowship Hall
- Parking lot lights replaced
- Chancel kneeling boxes painted
- Friendship Center contents removed temporarily
- Friendship Center recarpeted
- Friendship Center contents restored
- New bulletin board installed
- New FUMC sign installed at entry
- New computers purchased
Continuing issues:
- Education wing furnace repair (continuing problem); Carol Mead resource
- Flat roof leaks
- Mission statement
- Fellowship Hall roof leak in skate closet
On-going Projects:
- Fellowship hall roof restoration
- Re-seal windows on north side of church entry
- Modify French drain at south sanctuary exit to conform to Fire Dept. directive
- Restore outside to the old furnace room
- Refurbish exterior windows in Friendship Center
- Replace driveway, north side of Education wing
- Install new FUMC sign in front of church
- Remove poplar trees along south side of front lawn
|
|